Pakrashi, Vikram; Kelly, Joe; Harkin, Julie; Farrell, Aidan; Nanukuttan, Sreejith
(2010)
This paper outlines the repair methodology of Brownsbarn Bridge situated over the N7 near Dublin. The repair strategy was formulated following impact damage to the soffit from a low- loader carrying an excavator passing ...