Wave Pilot – Model recommendations for commercial stage

Loading...
Thumbnail Image
Files
D8.3_27032023.pdf(1001.77 KB)
Published Version
Date
2023-07
Authors
Devoy McAuliffe, Fiona
Kamidelivand, Mitra
Journal Title
Journal ISSN
Volume Title
Publisher
Selkie Project
Research Projects
Organizational Units
Journal Issue
Abstract
This report examines the estimated energy production, installation and OPEX costs for a Wave Energy Converter (WEC) pilot farm based on a generic oscillating water column device. The scenario uses the OE Buoy device matrix. It then looks at a second stage deployment and a full-scale commercial deployment, highlighting advantages of scaling up as well as potential challenges and bottlenecks, ultimately providing recommendations and advice for developers.
Description
Modified Installation, Operations, Maintenance and Logistics model for Irish and Welsh wave and tidal technologies and locations. Work Package 8: Installation, Operations & Maintenance and Logistic models. Report number: D8.3 Wave Pilot - Model recommendations for Commercial Stage
Keywords
Offshore Renewable Energy (ORE) Strategy , European Commission , SELKIE project , Wave and tidal energy industry , Commercialisation , Technology
Citation
Devoy McAuliffe, F. and Kamidelivand, M. (2023) 'Wave Pilot - Model recommendations for commercial stage', Selkie Project, D8.3 (24pp). Cork: MaREI, the SFI Research Centre for Energy, Climate and Marine, Environmental Research Institute, University College Cork. https://doi.org/10.13140/RG.2.2.10827.60967
Link to publisher’s version
Copyright
© 2023, the Authors. The views and opinions expressed in this publication are the sole responsibility of the author(s) and do not necessarily reflect the views of the European Commission.