Modelling the installation of next generation floating offshore wind farms

dc.contributor.authorDevoy McAuliffe, Fionaen
dc.contributor.authorJudge, Frances M.en
dc.contributor.authorMurphy, Jimmyen
dc.date.accessioned2024-08-19T09:03:53Z
dc.date.available2024-08-19T09:03:53Z
dc.date.issued2024-07-26en
dc.description.abstractThe offshore wind industry is advancing with larger turbines (10 MW+) into sites in deeper waters (>60 m), necessitating innovative floating substructures. However, Floating Offshore Wind (FOW) must still be proven to be cost-efficient, with special attention paid to developing installation, Operations and Maintenance (O&M) and decommissioning strategies that will ensure FOW is competitive. Simulation is an efficient way to assess the viability of new technologies and the innovative operations required to install and maintain them. This paper presents a novel tool that simulates the installation of fixed/floating offshore wind farms across an hourly time-series of Metocean data, producing a total estimation of costs as part of the total capital expenditure (CAPEX). The paper validates the model by simulating installation of Hywind Scotland, the FOW farm, and comparing results with published data. Given the lack of real-world cost data and experience, this paper then seeks to provide a well-defined case-study for future researchers to develop further in other regions and with different technologies. The tool is applied to a theoretical large commercial 1GW FOW farm commissioned in 2035 at a representative site in the Celtic Sea. This considers a promising location for FOW development outside the existing demonstration/early commercial FOW projects, which are primarily focused on the North Sea. Results indicate a CAPEX (including installation) of €3492/kW, which is in line with industry expectations. Sensitivity analysis applies a learning rate to reduce platform costs, and varies farm capacity, demonstrating the potential economies of scale when increasing farm size. Simulation identifies weather operational limits and cable installation duration as key contributors to installation time and costs. This quantifies where cost-savings can be found and optimisation should focus. Further modelling considers the scale of their impact on results. A final Levelised Cost of Energy assessment estimating an LCoE range of €52.3–64.59/MWh, placing the FOW farm in the context of global economic targets.en
dc.description.statusPeer revieweden
dc.description.versionPublished Versionen
dc.format.mimetypeapplication/pdfen
dc.identifier.articleidp.124001en
dc.identifier.citationMcAuliffe, F. D., Judge, F. M. and Murphy, J. (2024) 'Modelling the installation of next generation floating offshore wind farms', Applied Energy, 374, p.124001 (11pp).en
dc.identifier.doihttps://doi.org/10.1016/j.apenergy.2024.124001en
dc.identifier.endpage11en
dc.identifier.issn0306-2619en
dc.identifier.journaltitleApplied Energyen
dc.identifier.startpage1en
dc.identifier.urihttps://hdl.handle.net/10468/16200
dc.identifier.volume374en
dc.language.isoenen
dc.publisherElsevier Ltd.en
dc.rights© 2024, The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).en
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/en
dc.subjectFloating offshore winden
dc.subjectInstallationen
dc.subjectCostsen
dc.subjectEconomicsen
dc.subjectFinancial assessmenten
dc.subjectLogisticsen
dc.titleModelling the installation of next generation floating offshore wind farmsen
dc.typeArticle (peer-reviewed)en
oaire.citation.volume374en
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1-s2.0-S0306261924013849-main (1).pdf
Size:
1.6 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.71 KB
Format:
Item-specific license agreed upon to submission
Description: